• SER ScotlandScottish Flag
  • SER JerseyJersey Flag
  • Register
  • Log in
Structural Engineers Registration Ltd Logo
  • FAQs
  • About SER
  • Contact us
  1. Home
  2. Site Map

Site Map

  • Home
  • About SER
    • Memorandum & Articles
  • Contact us
  • FAQs
  • SER Scotland
    • Acceptance of Terms
    • About SER
      • Memorandum & Articles
    • Contact us
    • Join the Scheme
      • Joining Information
      • Firms
      • Individuals
        • Advice for those applying to become an SER Approved Certifier
      • Sole Practitioners
      • Payment Details
    • Find an SER Approved Certifier/Body
    • About the Scheme
      • Auditing
      • Certificate Fees from 3 January 2023
    • Resources
      • Scheme Guide
      • Audit Procedures
      • Certification Performance Criteria
        • B1.1 Certification Procedures and Records
        • B1.2 Project Records
        • B1.3 Programming of Work
        • B1.4 Use of Third Party Design Detail Option
        • B2.1 Loading Assessment
        • B2.2 Overall Stability
        • B2.3 Disproportionate Collapse
        • B2.4 Conversions
        • B2.5 Structural Movement Joints
        • B3.1 Ground Investigation Reports
        • B3.2 Existing Buildings Appraisal
        • B4.1 Mineral Consolidation
        • B4.2 Substructure (including ground floor slab but excluding piling)
        • B4.3 Piling
        • B4.4 Earth Retaining Structures
        • B4.5 Ground Improvement
        • B4.6 Superstructure – Principal Loadbearing Elements
        • B4.7 Superstructure – Stability Elements
        • B4.8 Superstructure – Other Elements
        • B4.9 Structural Ties, Fixings and Connections
        • B5.1 Building Envelope (including cladding and glazing)
        • B5.2 Building Envelope Fixings and Supports (including purlins, sheeting rails etc)
        • B5.3 Building Envelope Movement Joints
        • B6.1 Internal Partitions and Ceilings
        • B6.2 Protective Barriers
        • B6.3 Fixings and supports for building services
        • B7.1 Structural Specification
        • B9.1 Operating Within the Limits of Declared Competence
      • Guidance Notes
        • 1 - Background
        • 2 - Certification Practice
        • 3 - Options for Certification
        • 4 - Use of Certificates of Design
        • 5 - Reporting of Failure of Certified Structures
        • 6 - Responsibilities and Liabilities
        • 7 - Continuing Professional Development
        • 8 - Managing Post Certification Design Changes
        • 11 - Guidelines for Checking the Structural Design of Buildings
        • 12 - Building Risk Group Matrix
        • 13 - Change of Approved Certifier during a project
      • Certification Practice Notes
        • Certification Practice Note 1 - Windows
        • Certification Practice Note 2 - Staircases
          • Certification Practice Note 3 -Timber roofs
        • Certification Practice Note 3 -Timber roofs
        • Certification Practice Note 4 - Protective Barriers
        • Certification Practice Note 5 - Building Services
        • Certification Practice Note 6 - Modular buildings
        • Certification Practice Note 7 - Demolition
        • Certification Practice Note 8 - STAS
      • Procedures for Mentoring and Suspension with Mentoring
      • Technical Bulletins
      • Complaints, Disciplinary and Appeals Procedures
      • Guidance during COVID-19 pandemic
        • Monitoring of certification during COVID-19 pandemic
      • Application After Previous Termination of Membership
      • Multi-plot Form Q
      • Scottish government Building Standards Division guidance
      • Stakeholder Guidance
      • Tutorials
        • Generating a New Certificate for a Non-Staged Project
        • Generating a New Certificate for a Staged Project
        • Generating Additional Stages(s) to an existing Project
        • Converting a Non-Staged Project to a Staged Project
        • Generating an Amendment to Warrant
        • Structural Changes to Certificates Issued to the Local Authority
        • Schedule 1 - Third Party Designed Details
        • List of Information Used for the Purposes of Certification
        • Items to be Certified in a Later Stage
        • Generating a Form Q
        • Legacy Certificates
        • Continuing Professional Development (CPD)
        • CPD Activity Notepad
      • Blog
        • 2017
          • October
            • Our First Blog!
          • November
        • 2018
          • May
            • Changes to use of List of Information
          • June
            • Improvements to SER tutorials
          • July
            • Schedules: hints and tips
          • August
            • Common certification errors (and how to avoid them!)
            • Typical reinforcement details
            • Advice for those applying to become an SER Approved Certifier
          • September
            • How to certify staged projects - revised version
          • November
            • Certification coordinator changes
          • December
        • 2019
          • March
            • Certificates & Invoices: three SER processes you might not realise you can do yourself!
            • How to update your SER account details
            • New Approved Certifier Admin Area
            • New Approved Body Admin Area
        • 2020
          • December
        • 2021
          • June
            • Certification of the design of Protective Barriers
          • October
            • Guidance on signing certificates electronically
            • Relationship between Approved Bodies and Approved Certifiers
            • Relationship between Approved Bodies and Approved Certifiers
          • November
            • Approved Body documentation changes
            • Changes to Approved Certifier renewal process
          • December
        • 2022
          • April
            • Update on Auditing
          • December
            • CPD Activity Notepad
            • Importing CPD Notepad and Uploading IStructE & ICE returns (CPD return advice part 2 of 4)
            • SER CPD: Review, Activities and Intentions (CPD return advice part 3 of 4)
            • Step-by-step guide to completing your CPD return (CPD return advice part 4 of 4)
    • FAQs
    • Site Map
    • Terms & Conditions
      • Conditions of Use
      • Copyright
      • Website Privacy
    • Cookies
    • Search
    • Register
    • Log in
    • News
      • 2018
        • August
      • 2019
        • July
          • Withdrawal of Approved Certifier Registration Mark
        • August
        • September
          • New 2019 Editions of the Technical Handbook
        • October
      • 2020
        • February
        • December
          • Certification of the design of Rigid Inclusion Ground Improvement Systems
          • Monitoring of Certification
          • Re-appointment as a Scheme Provider
      • 2021
        • January
          • Certification Performance Criteria B8.1 and B8.2
        • March
          • CROSS
        • June
          • Application fee changes
        • July
        • November
          • SER certificate signing update
      • 2022
        • April
        • July
        • October
        • December
          • SER certificate fee increase from 2023
      • 2023
        • January
          • SER Certification Workshops 2023
          • Revised Guidance on Checking & Risk Groups and Mentoring & Suspension with mentoring
  • SER Jersey
    • Acceptance of Terms
    • About SER
      • Memorandum & Articles
    • Contact us
    • Join the Scheme
      • Joining Information
      • Firms
      • Individuals
        • Advice for those applying to become an SER Approved Certifier
      • Sole Practitioners
      • Payment Details
    • Find an SER Approved Certifier/Body
    • Resources
      • Scheme Guide
      • Audit Procedures
      • Certification Performance Criteria
        • B1.1 - Certification Procedures and Records
        • B1.2 - Project Records
        • B1.3 - Programming of Work
        • B1.4 - Use of Yet to be Designed Details Option (Schedule 2)
        • B2.1 - Loading Assessment
        • B2.2 - Overall Stability
        • B2.3 - Disproportionate Collapse
        • B2.4 - Material Change of Use
        • B2.5 - Structural Movement Joints
        • B3.1 - Ground Investigation Reports
        • B3.2 - Existing Buildings Appraisal
        • B4.2 - Substructure (including gound floor slab but excluding piling)
        • B4.3 - Piling
        • B4.4 - Earth Retaining Structures
        • B4.5 - Ground Improvement
        • B4.6 - Superstructure - Principal Load-bearing Elements
        • B4.7 - Superstructure - Stability Elements
        • B4.8 - Superstructure - Other Elements
        • B4.9 - Structural Ties, Fixings and Connections
        • B5.1 - Building Envelope (including cladding and glazing)
        • B5.2 - Building Envelope Fixings and Supports (including purlins, sheeting rails etc)
        • B5.3 - Building Envelope Movement Joints
        • B6.1 - Internal Partitions and Ceilings
        • B6.2 - Protective Barriers
        • B7.1 - Structural Specification
        • B8.1 - Elements of Structure (as defined by Part 2)
        • B8.2 - Single Storey Steel Portal Framed Buildings
        • B9.1 - Operating Within the Limits of Declared Competence
      • Guidance Notes
        • 1 - Certification of Compliance with the Building Bye-laws
        • 2 - Options for Certification
        • 3 - Use of Certificates of Design
        • 4 - Reporting of Failure of Certified Structures
        • 5 - Continuing Professional Development
        • 6 - Responsibilities and Liabilities
        • 7 - Guidelines for Checking the Structural Design of Buildings
        • 8 - Building Risk Group Matrix
      • Technical Bulletins
        • 1 - Procedure for the Submission of Structural Design Information
        • 3 - Certification of the Design of Timber Framed Structures
        • 4 - Certifying the Structural Design of Conservatories
        • 5 - Certifying the Structural Design of Protective Barriers
        • 6 - Certification of the Structural Design of Glazing Systems
      • Complaints and Appeals Procedures
      • Tutorials
        • Generating a New Certificate for a Non-Staged Project
        • Generating a New Certificate for a Staged Project
        • Generating Additional Stage(s) to an existing Project
        • Converting a Non-Staged Project to a Staged Project
        • Continuing Professional Development (CPD)
        • CPD Activity Notepad
      • Blog
        • 2018
          • May
            • Changes to use of Schedule 1
          • August
            • Advice for those applying to become an SER Approved Certifier
          • September
          • November
            • Certification coordinator changes
          • December
        • 2019
          • March
            • Certificates & Invoices: three SER processes you might not realise you can do yourself!
            • How to update your SER account details
            • New Approved Certifier Admin Area
            • New Approved Body Admin Area
        • 2020
          • December
        • 2021
          • October
            • Guidance on signing certificates electronically
            • Relationship between Approved Bodies and Approved Certifiers
            • Relationship between Approved Bodies and Approved Certifiers
          • November
            • Approved Body documentation changes
            • Changes to Approved Certifier renewal process
        • 2022
          • December
            • CPD Activity Notepad
            • Importing CPD Notepad and Uploading IStructE & ICE returns (CPD return advice part 2 of 4)
            • SER CPD: Review, Activities and Intentions (CPD return advice part 3 of 4)
            • Step-by-step guide to completing your CPD return (CPD return advice part 4 of 4)
    • About the Scheme
      • Auditing
      • Certificate Fees
    • FAQs
    • Site Map
    • Terms & Conditions
      • Conditions of Use
      • Copyright
      • Website Privacy
    • Cookies
    • Search
    • Register
    • Log in
    • News
      • 2018
        • May
      • 2019
        • July
      • 2020
        • December
      • 2021
        • March
          • CROSS
        • June
          • Application fee changes
      • 2022
        • March
        • May
  • Site Map
  • Terms & Conditions
    • Conditions of Use
    • Copyright
    • Website Privacy
  • Cookies
  • Search
  • Register
  • Log in

Welcome to the Structural Engineers Registration website. This site uses cookies. If you would like to know more please read our Cookie Policy.

Close
  • Structural Engineers Registration Limited
  • 47-58 Bastwick Street
  • London
  • EC1V 3PS
  • United Kingdom
Contact us
  • Site Map
  • Terms & Conditions
  • Cookies
  • The Institution of Structural Engineers Logo
  • Institution of Civil Engineers Logo
© Copyright 2023 SER Ltd. Registered in England no. 5251866 VAT registration no. 844 1896 02 EC VAT no. IE 6358941 E